A new episode of our Inside Lakeside series is now live on our YouTube channel — a format in which we share key moments from the development of the Lakeside11 project.
This edition was filmed on the rooftop of one of the Phase One buildings, on the day the structural frame was completed — a significant milestone in the project’s evolution.
🎥 The Rooftop Episode and the People Behind Lakeside11
To celebrate this stage, we brought together everyone who contributes daily to the project’s realization:
the architects, designers, contractor, health & safety coordinator, and the technical experts involved in the development of Lakeside11.
We spoke with them about how the structural stage unfolded, which engineering decisions proved essential, and what makes Lakeside11 a distinctive project shaped with attention to detail at every step.
🔍 In this episode, you will discover:
• why the completion of the structural frame is such an important milestone;
• how an idea becomes reality through the work of architects and design teams;
• why Lakeside11 is regarded as a unique and forward-thinking development;
• how its design and architecture earned international recognition (Red Dot Award 2025);
• what stands behind the Float Spots concept;
• which engineering solutions ensure the building’s stability and safety;
• what defines the quality and organization of the construction process;
• why safety is a fundamental principle of the project;
• how the team’s professionalism and experience shape the future of Lakeside11;
• and why the development represents not only buildings, but a new way of living.


