Inside Lakeside | May 2025 — Construction Progress and Ytong Technology by Xella Romania

May 30, 2025

RRG Real Estate Group, a trusted residential developer in Bucharest, presents a new episode of the Inside Lakeside video series, highlighting Lakeside11 — a business-class residential project in the north of the capital, near Lake Străulești.

🏗 What you’ll see in this episode:

📈 Major progress on-site in Bucharest
Over the past two months, construction at Lakeside11 advanced by 8 floors across all three blocks — a clear demonstration of timely execution and project quality.

🧱 Start of masonry work using Ytong blocks
We’ve entered a new phase — wall construction. The material of choice is Ytong blocks, supplied by Xella Romania. These aerated concrete blocks provide:
• Outstanding thermal insulation
• Effective soundproofing between apartments
• Long-term durability and eco-efficiency

🎤 Interview: Why did we choose Ytong?
In this episode, we spoke with Mircea Sibana, Product Manager at Xella Romania, about the benefits of Ytong and key aspects of its use on the construction site.

📊 A scale that impresses
You’ll also find out how many blocks are needed for Phase 1 and how their combined height compares to the iconic Burj Khalifa.

 

https://lakeside11.ro/wp-content/uploads/2024/03/Lakeside11-favicon-white.svg

Lakeside11 – A place to breathe easy. A project powered by RRG.

RPA awards 2024
LOCATION ON MAP
google maps logo white
https://lakeside11.ro/wp-content/uploads/2024/04/waze-logo.webp

© Lakeside11. All rights reserved.