Completion of the Structural Frame at Lakeside11

September 19, 2025

In the Lakeside11 residential complex, the reinforced concrete structural frame of the buildings in Phase One has been successfully completed.

Why is this milestone important?
The structural frame is the foundation of the entire building. At this stage, the project takes on its real shape: the height, scale, and architectural identity of the future complex become visible. Completion of the frame means the project now moves on to façade works, windows and utility networks.

What has already been achieved:

  • The load-bearing structures of Phase One have been completed.
  • The construction progress is fully in line with the schedule.
  • The quality of materials and technologies used has been confirmed.

What does this mean for future residents and investors?

  • Transparency and trust — we demonstrate that construction is on time and in full compliance with the project documentation.
  • Visible progress — it is now easy to imagine what the finished complex will look like.
  • Confidence in the future — each stage secures the project’s value, while strong demand for apartments confirms the investment appeal of Lakeside11.

📌 Lakeside11 — a business-class residential complex on the shores of Lake Străulești. Spacious layouts, the Float Spot concept with relaxation areas, video projection and playgrounds, as well as a gated community — all designed for safe and comfortable living.

https://lakeside11.ro/wp-content/uploads/2024/03/Lakeside11-favicon-white.svg

Lakeside11 – A place to breathe easy. A project powered by RRG.

RPA awards 2024
LOCATION ON MAP
google maps logo white
https://lakeside11.ro/wp-content/uploads/2024/04/waze-logo.webp

© Lakeside11. All rights reserved.